Marrickville Cafe & Art Gallery

Previous Next Who They Are Fresh Hope Address 387 Illawarra Road, Marrickville Scope of project Design & Construct SQM 250sqm Cost of fitout — Timeline 5 months SCOPE OF WORKS Excavation of ground floor to supply and install of grease pump and trap below surface Supply and install all base building mechanical works  Supply and […]

Shaipe Fitness

Previous Next Who They Are Shaipe Fitness Address 500 Pacific Highway, St Leonards Scope of project Design and Construct SQM 200 sqm Cost of fitout $150K Timeline 4 weeks  SCOPE OF WORKS Supply and install of new waterproofing and creation of two new bathroom / change rooms membrane Supply and install of new vinyl flooring […]

Blackwattle Deli

Previous Next Who They Are https://blackwattledeli.com.au/ Address Sydney Fish Market, Pyrmont NSW 2009 Scope of project Design and Construct SQM 80 sqm Cost of fitout $450K Timeline 3 weeks  SCOPE OF WORKS Demolition and make good of site prior to construction Upgrade of electrical boards from 24 pole DB to 36 pole DB Supply and […]

Machi Machi

Previous Next Who They Are https://machimachi.com.au/ Address Sydney Fish Market, Pyrmont NSW 2009 Scope of project Construct SQM 35 sqm Cost of fitout $125K Timeline 3 weeks  SCOPE OF WORKS Demolition and make good of site prior to construction Upgrade of electrical boards from 24 pole DB to 36 pole DB Install of new set […]

Cornersmith

Previous Next Who They Are https://www.cornersmith.com.au/ Address 88 View St, Annandale NSW 2038 Scope of project Construction SQM 180 sqm Cost of fitout $900K Timeline 5 Months SCOPE OF WORKS Conversion of dilapidated residential terrace into a newly refurbished commercial restaurant / café Cut out of existing brick wall facades to install new large observation […]

Chargrill Charlie’s French’s Forest

Chargrill Charlie's

CHARGRILL CHARLIE’S Who They Are Chargrill Charlie’s Address Frenchs Forest Sydney NSW Scope of project Construction SQM 100 sqm Cost of fitout $170K  Timeline 2 week SCOPE OF WORKS • Supply and install of timber hoarding prior to construction works• Demolition of existing planter boxes, existing brick wall, windows and doors• Supply and install aluminium […]

F45 Bondi

F45 BONDI Who They Are F45 Bondi Address Bondi, Sydney NSW Scope of project Design & Construction SQM 370 sqm Cost of fitout $130K  Timeline 2 week SCOPE OF WORKS Supply and install new ramping and flooring Supply and install of new bathrooms and showers Modification to existing fire and mechanical services Patch and paint […]

F45 Barangaroo

F45 Kent Street

F45 BARANGAROO Who They Are F45 Barangaroo Address Barangaroo, Sydney NSW Scope of project Design & Construction SQM 150 sqm Cost of fitout $100K  Timeline 1 week SCOPE OF WORKS Supply and install new ramping and flooring Supply and install of new bathrooms and showers Modification to existing fire and mechanical services Patch and paint […]

Oscar Wylee Parramatta

Previous Next Who They Are https://www.oscarwylee.com.au/ Address Westfield Parramatta, Level 3 Shop 3027A/159 – 175 Church St, Parramatta NSW 2150 Scope of project Construction SQM 60 sqm Cost of fitout $315K Timeline 6 weeks  SCOPE OF WORKS Supply and install steel structure shopfront Supply and install 12MM clear toughened glass with Dorma hardware fittings Supply […]

Oscar Wylee The Galleries

Previous Next Who They Are https://www.oscarwylee.com.au/ Address Ground Level, 275 Pitt St, Sydney NSW 2000 Scope of project Construction SQM 40 sqm Cost of fitout $300K Timeline 4 weeks SCOPE OF WORKS Supply and install steel structure shopfront Supply and install 12MM clear toughened glass with Dorma hardware fittings Supply and install timber ceiling support […]